6. Click the Set Up and Start Test button to start the test and display the pass/fail results.
7. Repeat the mask test for each of the test loads (100 Ω, LOAD1, and LOAD2) by changing jumpers setting
in Table 2, and for each pulse polarity (normal and inverted). There will be total 6 mask tests. Be sure to
touch the Set Up and Start Test button after each test is selected.
8. Remove jumpers J1, J6, J14, J16, and install jumpers J7, J8, J9, J10, to test without TPM.
9. Connect SMA cables from oscilloscope Channel 2 to fixture J84, Channel 3 to J85 (
X
Figure 14
X
).
10. Select DOV Peak in the Select Test” field, then touch the Set Up and Start Test button. The screen will
change and the peak differential output voltage (DOV) will be measured. Parameter P1 indicates the peak
voltage, and Q1 and Q2 test the upper and lower limits of this value.
11. Select DOV Harmonics in the “Select Test” field, then touch the Set Up and Start Test button. The
display will show the Ethernet signal trace, and P1 will display the peak harmonic level in the power
spectrum of the signal. The Device Under Test should be transmitting an “all ones” pattern, which will be
coded as alternating positive and negative going pulses. This waveform will give the worst-case power
spectrum with the highest-level harmonics.